Low winter temperatures are a challenge for UV sterilizer operation. Cold can cause the unit to freeze, make lamps hard to start, and accelerate seal aging, among other problems. Longkang provides winter maintenance guidance to help equipment pass the cold season safely. This article sets out the key points of winter maintenance for UV disinfection equipment.
1. Winter Operating Risks
1.1 Freezing risk
- When ambient temperature falls below 0 °C, water inside the unit may freeze
- Water expands by 9% in volume on freezing and can damage the chamber and quartz sleeve
- Frozen pipes interrupt the water supply
- Leaks may appear after the ice thaws
1.2 Difficulty starting lamps
- The ideal operating temperature for low-pressure lamps is 40–60 °C
- At very low ambient temperatures, lamps are hard to start
- UV output is low immediately after start-up
- Frequent starting shortens lamp life
1.3 Ballast low-temperature performance
- Electronic ballasts are generally rated for -10 °C to 50 °C
- At very low temperatures, electrolytic capacitor capacitance falls
- The ballast becomes hard to start
- It may be damaged
1.4 Seal hardening
- Rubber seals harden at low temperatures
- Elasticity is reduced
- Sealing performance deteriorates
- Leaks may occur
1.5 Cable embrittlement
- Standard cables become brittle at low temperatures
- They may crack
- Insulation resistance falls
2. Pre-Winter Inspection (Late October to Early November)
2.1 Equipment inspection
- Inspect the exterior for corrosion or damage
- Inspect the chamber for leakage
- Inspect lamp holders for sound sealing
- Inspect the control cabinet: closes properly, no water ingress
- Inspect cables for damage or aging
2.2 Insulation inspection
- Check that the equipment insulation layer is intact and has not come loose
- Check that pipe insulation is intact
- Check that electric heat tracing works normally
- Check the thermostat setting (start at 5 °C, stop at 15 °C)
- Check that the insulated enclosure / plant room is well sealed
2.3 Electrical inspection
- Measure insulation resistance: ≥ 2 MΩ
- Check that grounding is reliable
- Check that wiring connections are tight
- Check that the circuit breaker and residual-current protection are functional
- Check that the ballast operates normally
2.4 Seal inspection
- Inspect O-rings for aging or hardening
- Replace any aged seals
- Inspect flange gaskets
- Ensure the seal is reliable
2.5 Drainage inspection
- Check that the drain valve is functional
- Check that the air release valve is functional
- Check pipe slope for complete draining
- No standing water in low points
3. Winter Operation and Maintenance
3.1 Keep the unit running
- Keep the unit in operation through winter (flowing water resists freezing)
- Do not shut down for long periods
- 24-hour continuous operation
- Moving water is less likely to freeze
3.2 Temperature monitoring
- Monitor ambient temperature
- Monitor water temperature
- Start heat tracing when temperature falls below 5 °C
- Log temperature readings
3.3 Heat tracing checks
- Check electric heat tracing operation daily
- Check the thermostat setting
- Check the heat tracing temperature
- Repair any heat tracing fault promptly
3.4 Insulation checks
- Inspect the insulation layer periodically
- Repair any detached insulation promptly
- Keep pipe insulation intact
- Insulate valves (freeze-prone points)
3.5 Intensified inspections
- Increase inspection frequency in winter
- At least twice a day
- Focus on checking for ice formation
- Check equipment operating status
- Check for leakage
4. Freeze Protection During Short-Term Shutdown
4.1 Shutdown of no more than 3 days
- Keep the unit energized (so heat tracing operates)
- Maintain a small trickle flow (drip to prevent freezing)
- Or run in recirculation mode
- Inspect periodically
4.2 Shutdown of 3–7 days
- Drain all water from the unit and pipes
- Blow dry with compressed air
- Close all valves
- Keep the unit insulated
- Inspect periodically
4.3 Shutdown of more than 7 days
- Completely drain all water from the unit and pipes
- Blow dry with compressed air
- Remove the lamps (to prevent low-temperature damage)
- Wrap the unit in insulation
- Inspect periodically
- Inspect again before restarting
5. Freeze Protection During Long-Term Shutdown (Out of Service for Winter)
5.1 Draining
- Close the inlet and outlet valves
- Open the drain valve
- Open the air release valve
- Drain all water from the chamber
- Drain the lowest points of the piping
- Blow the chamber and pipes dry with compressed air
5.2 Removing the lamps
- Switch off the power
- Remove the lamps
- Store lamps properly (room temperature, dry, protected from vibration)
- Log the accumulated lamp operating hours
5.3 Seal protection
- Plug the lamp holder openings (to keep out dust and pests)
- Close all valves
- Wrap the unit in insulation material
- Place desiccant inside the control cabinet
5.4 Periodic inspection
- Inspect once a month
- Check for water ingress or ice
- Check the desiccant
- Check the insulation
- Keep records
6. Handling Freeze-Up
6.1 If freezing is found
- Switch off the power immediately (to prevent electric leakage if the unit is damaged)
- Do not force a start-up
- Do not pour hot water on it (a large temperature difference can cause cracking)
- Do not strike it (this may cause damage)
6.2 Natural thawing
- Raise the ambient temperature (heating)
- Let the ice thaw naturally
- Inspect the unit after thawing
- Check the chamber and sleeve for cracks
- Check the seals
6.3 Repairing damage
- Chamber cracked: replace or repair-weld
- Sleeve cracked: replace the sleeve
- Seals damaged: replace them
- Lamps damaged: replace them
- Hydrostatic pressure test (1.5 times the pressure) after repair
- Power-on test
7. Restarting in Spring (Late March to Early April)
7.1 Equipment inspection
- Inspect the exterior for freeze damage or corrosion
- Inspect the chamber for cracks
- Inspect the sleeve for cracks
- Inspect seals for aging
- Inspect electrical items: insulation and grounding
7.2 Installing the lamps
- Reinstall the lamps removed for winter
- Or fit new lamps (if they have reached end of life)
- Check lamp holder contact
- Power-on test
7.3 Water filling and pressure test
- Close the drain and air release valves
- Open the inlet valve slowly
- Fill with water and vent the air
- Check for leakage
- Hydrostatic pressure test (1.5 times the pressure)
7.4 Power-on operation
- Confirm unobstructed water flow
- Switch on the power
- Verify that the lamps light
- Check operating parameters
- Measure UV intensity
- Test the water quality
7.5 Removing the insulation
- Once ambient temperature is stable above 5 °C
- Remove the winter insulation (if temporary)
- Check the heat tracing (switch it off)
- Clean the equipment
8. Key Points for Winter Maintenance
- Freeze protection first: preventing freezing is the top winter priority
- Keep running: keep the unit in service where possible; flowing water resists freezing
- Drain completely: all standing water must be drained before a shutdown
- No hot water: never pour hot water on frozen parts, to avoid cracking
- No striking: never strike frozen parts, to avoid damage
- More inspections: increase inspection frequency in winter
- Spare parts ready: keep lamps, sleeves and seals in stock
- Records: archive winter maintenance records
9. Longkang Winter Services
- Winter freeze-protection schemes
- Insulation and heat tracing retrofit service
- Pre-winter inspection service
- 24-hour emergency service
- Repair of freeze damage
- Spring restart service
- Winter maintenance guidance
- Genuine spare parts supply
- Lifetime technical support