UV Sterilizer Factory Inspection Items

Longkang UV sterilizer undergoing final factory inspection before shipment
Full factory inspection of a UV sterilizer before delivery

Factory inspection is the final quality gate for UV sterilizers, ensuring that every unit meets standards and customer requirements. Longkang has established a complete factory inspection system, and every product undergoes strict testing before shipment. This article explains the factory inspection items and standards in detail.

1. Inspection system

The Longkang UV sterilizer factory inspection process:

  1. Appearance inspection
  2. Dimension inspection
  3. Material inspection
  4. Hydrostatic test
  5. Electrical testing
  6. Operation test
  7. Performance testing
  8. Documentation inspection
  9. Packaging inspection

Every product must pass all inspections before it leaves the factory.

2. Appearance inspection

2.1 Chamber appearance

  • Smooth surface with no obvious scratches or dents
  • Flat welds with no porosity, cracks or slag inclusion
  • Weld slag cleaned thoroughly
  • Uniform internal polishing, Ra ≤0.8 µm
  • Uniform brushed or matte external finish
  • No rust and no oil stains

2.2 Electrical parts appearance

  • Control cabinet surface intact, with no deformation or scratches
  • Cabinet door opens and closes smoothly and seals well
  • Indicator lights and buttons firmly installed
  • Labels clear and complete
  • Cable entries well sealed
  • No exposed wire ends

2.3 Overall appearance

  • Overall harmony with no obvious defects
  • Nameplate firmly installed with clear information
  • Complete warning labels
  • Consistent colour
  • Clean and free of stains

3. Dimension inspection

3.1 Overall dimensions

  • Total length, total width and total height
  • Tolerance: ±5 mm
  • Comply with drawing requirements

3.2 Connection dimensions

  • Inlet and outlet flange diameter, number of bolt holes and bolt hole diameter
  • Flange standard: GB/T 9119
  • Small-bore threads: GB/T 7306
  • Tolerance: ±1 mm

3.3 Installation dimensions

  • Support hole spacing
  • Installation height
  • Centre height
  • Tolerance: ±2 mm

3.4 Chamber dimensions

  • Cylinder inner diameter and length
  • Wall thickness
  • Lamp holder hole spacing
  • Tolerance: ±1 mm

4. Material inspection

4.1 Stainless steel

  • Chamber: 304 or 316L stainless steel
  • Material verified by spectroscopic analysis
  • Complies with GB/T 20878
  • Material certificate for every batch

4.2 Quartz sleeve

  • High-purity quartz glass
  • Transmittance ≥90 percent at 254 nm
  • No bubbles or stones in appearance
  • Dimensions meet requirements

4.3 UV lamps

  • Brand-name lamps
  • Power meets requirements
  • Normal lighting test
  • UV output meets the standard

4.4 Seals

  • Fluororubber O-rings
  • Shore A hardness 60–70
  • Dimensions meet requirements
  • Resistant to ageing and corrosion

5. Hydrostatic test

5.1 Test pressure

  • 1.5 times the rated working pressure
  • Standard model: 1.5 MPa

5.2 Holding time

  • 30 minutes (above the 10-minute national standard)

5.3 Acceptance criteria

  • No leakage
  • No deformation
  • Pressure drop ≤1 percent

5.4 Records

  • Test record of every unit archived
  • Test operator’s signature

6. Electrical testing

6.1 Insulation resistance

  • Between live parts and the enclosure
  • ≥2 MΩ (cold state)
  • Measured with a 500 V megohmmeter

6.2 Dielectric strength

  • Between live parts and the enclosure
  • 1500 VAC for 1 minute
  • No breakdown and no flashover
  • Measured with a withstand voltage tester

6.3 Earth continuity

  • Between the earth terminal and accessible metal parts
  • ≤0.1 Ω
  • Measured with an earth resistance tester

6.4 Earth resistance

  • From the equipment earth terminal to ground
  • ≤4 Ω
  • Measured with an earth resistance tester

6.5 Power factor

  • ≥0.95 (electronic ballast)
  • Measured with a power analyser

6.6 Leakage current

  • ≤0.75 mA (for personal safety)
  • Measured with a leakage current tester

7. Operation test

7.1 Start-up test

  • Power on and lamps start normally
  • Start-up time <1 s (low-pressure lamps)
  • No flicker and no abnormality

7.2 Continuous operation

  • Operate continuously for 2 hours
  • Lamp brightness stable
  • Ballast temperature normal (≤70 °C)
  • No abnormal noise or odour
  • No tripping and no alarms

7.3 Operating parameters

  • Input voltage: 220 V ±10 percent or 380 V ±10 percent
  • Input current: meets the rated value
  • Lamp power: ±10 percent
  • Power factor: ≥0.95

7.4 Protection functions

  • Overcurrent protection: simulate overcurrent and verify the protection operates
  • Short-circuit protection: simulate a short circuit and verify the protection operates
  • Alarm function: simulate a fault and verify the alarm operates
  • Elapsed-time counter: lamp operating hours accumulate normally

8. Performance testing

8.1 UV intensity

  • Measured with a UV intensity meter (254 nm)
  • At the chamber centre or a designated position
  • Intensity of a new lamp ≥ design value
  • Intensity uniformity ≥70 percent

8.2 Treatment capacity verification

  • Operate at the rated flow
  • Stable flow
  • Head loss ≤0.05 MPa
  • No abnormal vibration

8.3 Germicidal efficacy (spot check)

  • Third-party testing body
  • Indicator organisms: Escherichia coli or MS2 bacteriophage
  • Kill rate ≥99.99 percent at 40 mJ/cm²
  • Type test at least once a year

8.4 Noise

  • Operating noise ≤50 dB(A)
  • Measured with a sound level meter
  • At a distance of 1 m from the equipment

9. Documentation inspection

9.1 Certificate of conformity

  • One certificate supplied with every unit
  • Contents: product name, model, number, inspection result, inspector and date
  • Valid with an official seal

9.2 User manual

  • Contents: product introduction, working principle, installation guidance, operating instructions, maintenance, troubleshooting and technical parameters
  • Illustrated with text and diagrams
  • Complies with GB 9969

9.3 Electrical schematics

  • Schematic diagram and wiring diagram
  • Component list
  • Clear wire numbers

9.4 Test reports

  • Hydrostatic test report
  • Electrical testing report
  • Operation test report
  • UV intensity test report
  • Third-party germicidal test report (copy)

9.5 Warranty card

  • Warranty period and scope
  • After-sales service contact information
  • Maintenance records

10. Packaging inspection

10.1 Packaging method

  • Lamps packaged separately with shock protection
  • Main equipment in a wooden or cardboard crate
  • Shockproof and moisture-proof
  • Accessories packed in the same crate

10.2 Packaging markings

  • Product name and model
  • Quantity and weight
  • Fragile, moisture-proof and this-side-up markings
  • Shipping label
  • Manufacturer name and address

10.3 Accessory list

  • Main equipment
  • UV lamps
  • Quartz sleeve (spare)
  • O-rings (spare)
  • User manual
  • Certificate of conformity
  • Warranty card
  • Installation bolts (optional)

11. Inspection records and traceability

11.1 Inspection records

  • An inspection record sheet for every product
  • Results of all inspection items
  • Inspector’s signature
  • Date
  • Archived for 5 years

11.2 Product number

  • A unique number for every product
  • Number includes model, production date and serial number
  • Printed on the nameplate
  • Traceable to the production batch and inspection records

11.3 Traceability system

  • Raw material batches traceable
  • Production process traceable
  • Inspection records traceable
  • Date of shipment traceable
  • Customers can make enquiries

12. Nonconforming product handling

  1. Identification and isolation: mark nonconforming products and store them separately
  2. Cause analysis: analyse the cause of nonconformity
  3. Rework and repair: rework where possible and reinspect after repair
  4. Scrap: scrap items that cannot be reworked
  5. Corrective and preventive action: take measures to prevent recurrence
  6. Records: archive the handling records of nonconforming products

13. Longkang factory inspection commitment

  1. Every product receives a full inspection before it leaves the factory
  2. Complete inspection items (appearance, dimensions, materials, hydrostatic test, electrical, operation and performance)
  3. Strict inspection standards (above the national standard)
  4. Inspection equipment calibrated and qualified
  5. Inspectors certified for their positions
  6. Complete and traceable inspection records
  7. No nonconforming product leaves the factory
  8. Each product is supplied with a certificate of conformity and a test report
  9. Lifetime quality traceability
  10. Customers may verify by sampling

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.