Quartz Sleeve Installation Process for UV Sterilizers

Quartz sleeve being fitted into a UV sterilizer chamber during installation
Quartz sleeve installation in a UV sterilizer

The quartz sleeve is a key component of a UV sterilizer: it protects the lamp while allowing ultraviolet light to pass through. Installation quality directly affects sealing performance and disinfection results. Longkang applies a standardized installation process to ensure every sleeve is fitted correctly and sealed reliably. This article explains the quartz sleeve installation process in full.

1. Function of the quartz sleeve

  1. Lamp protection: isolate the lamp from water to prevent damage from water contact
  2. UV transmission: let 253.7 nm ultraviolet light pass through efficiently and irradiate the water
  3. Pressure sealing: withstand water pressure and prevent leakage
  4. Electrical insulation: provide insulation to prevent current leakage
  5. Easy replacement: replace a failed lamp without draining the chamber (the sleeve isolates the water)

2. Pre-installation preparation

2.1 Sleeve inspection

  • Material: high-purity quartz glass (JGS1/JGS2)
  • Appearance: no cracks, bubbles, stones or scratches
  • Dimensions: outside diameter, inside diameter, length and wall thickness conform to the drawing
  • Transmittance: ≥90 percent at 254 nm, with a factory test report
  • End faces: flat, no chipping, good perpendicularity

2.2 Seal inspection

  • O-ring: fluororubber (FKM), matching size
  • Hardness: Shore A 60 to 70
  • Appearance: no cracks, deformation or foreign matter
  • Seal seat: stainless steel, matching size
  • Compression nut: stainless steel, intact threads

2.3 Tools

  • Lint-free gloves
  • Lint-free cloth
  • Alcohol (analytical grade)
  • Torque wrench
  • Silicone grease (food grade, a small amount for O-ring lubrication)
  • Feeler gauge (to check O-ring compression)

2.4 Chamber inspection

  • Lamp seat holes: smooth, no burrs or damage
  • Sealing surfaces: flat, no scratches
  • Threads: intact, no corrosion
  • Chamber interior: clean, no foreign matter

3. Sleeve cleaning

3.1 Why cleaning matters

  • Oil, fingerprints and dust on the sleeve surface reduce UV transmittance
  • Fingerprints can be baked onto the glass under high lamp temperature, permanently lowering transmittance
  • Cleaning before installation is mandatory

3.2 Cleaning method

  1. Put on lint-free gloves
  2. Dampen a lint-free cloth with analytical-grade alcohol
  3. Wipe the inner and outer walls of the sleeve
  4. Pay particular attention to the sealing surfaces at both ends
  5. Allow to air-dry (or wipe dry with a lint-free cloth)
  6. Do not touch the sleeve with bare hands after cleaning

3.3 Cleaning standard

  • No oil, fingerprints or dust on the surface
  • Transmittance unaffected
  • Sealing surfaces clean and smooth

4. O-ring installation

4.1 O-ring inspection

  • Size matches the sealing groove
  • No twisting or cracks
  • Smooth surface

4.2 O-ring lubrication

  • Apply a small amount of food-grade silicone grease
  • Lubrication eases installation and prevents the O-ring from twisting
  • Silicone grease does not affect sealing performance
  • Do not apply too much (to avoid extrusion)

4.3 O-ring fitting

  • Fit the O-ring into the sealing groove
  • Ensure the O-ring is fully seated
  • No twisting or lifting
  • Fit one O-ring on each seal seat at both ends

5. Sleeve insertion

5.1 Insertion direction

  • Insert through the lamp seat hole at one end of the chamber
  • Insert slowly and steadily
  • Avoid contact with the chamber wall and the lamp seat hole
  • The other end of the sleeve emerges from the lamp seat hole at the opposite end

5.2 Insertion precautions

  • Operate with gloves
  • Do not touch the middle of the sleeve (the light-transmitting zone) with your hands
  • Handle with care to avoid impact
  • If resistance is met during insertion, check for burrs or misalignment
  • Do not force the insertion (it may crack the sleeve)

5.3 Position adjustment

  • The sleeve protrudes symmetrically at both ends
  • The sleeve is centred, not skewed
  • The sleeve does not touch the chamber wall
  • Sealing surfaces at both ends are correctly positioned

6. Seal seat installation

6.1 Seal seat at one end

  • Slip the seal seat onto one end of the sleeve
  • Align the seal seat with the lamp seat
  • Align the O-ring with the sealing groove
  • Push in slowly, making sure the O-ring does not twist

6.2 Seal seat at the other end

  • Install the other end in the same way
  • Both ends symmetrical
  • Ensure the sleeve is centred

6.3 Compression nut

  • Slip the compression nut into place
  • Thread it in by hand
  • Ensure the threads engage correctly (no cross-threading)
  • Tighten with a torque wrench

6.4 Tightening torque

  • Depends on the seal seat size and O-ring specification
  • Typical: DN20 to DN32, 10 to 15 N·m
  • DN40 to DN50, 15 to 20 N·m
  • DN65 and above, 20 to 30 N·m
  • Too little torque: the seal is not tight and water leaks
  • Too much torque: the O-ring or seal seat may be crushed

6.5 O-ring compression

  • Compression: 25 to 30 percent of the cross-section diameter
  • Check with a feeler gauge or by experience
  • Correct compression: reliable sealing and long O-ring life
  • Too little compression: leakage
  • Too much compression: permanent deformation of the O-ring and short life

7. Seal test

7.1 Visual inspection

  • O-rings in place, no twisting
  • Seal seats in place
  • Compression nuts tightened
  • Both ends symmetrical

7.2 Hydrostatic test

  • Close all openings (leave the water inlet open)
  • Fill with water and expel all air
  • Pressurize to 1.5 times the rated pressure
  • Hold the pressure for 10 to 30 minutes
  • Check the lamp seat seals: no seepage
  • No seepage means the test is passed

7.3 Leak handling

  • If leakage is found:
    • Depressurize and drain
    • Check whether the O-ring is in place and undamaged
    • Check the sealing surface for scratches
    • Reinstall or replace the O-ring
    • Retest the pressure

8. Post-installation inspection

8.1 Sleeve position

  • Sleeve centred, not skewed
  • Not touching the chamber wall
  • Protrudes symmetrically at both ends

8.2 Sealing

  • No seepage
  • O-ring compression correct

8.3 Appearance

  • Sleeve free of cracks and damage
  • Seal seats undamaged
  • Clean, no stains

8.4 Records

  • Installation date
  • Sleeve batch
  • Installer
  • Pressure test result
  • Archive the record

9. Common problems and solutions

9.1 Sleeve breakage

  • Cause: impact during installation, excessive tightening force, large temperature difference, or sleeve quality problem
  • Solution: replace the sleeve and follow the proper installation procedure
  • Prevention: handle with care, use correct torque, avoid sudden cooling and heating

9.2 Lamp seat leakage

  • Cause: O-ring not seated, O-ring damaged, scratches on the sealing surface, or insufficient tightening force
  • Solution: reinstall the O-ring, replace the O-ring, repair the sealing surface, or increase the tightening force
  • Prevention: inspect before installation, install to specification, use correct torque

9.3 Sleeve misalignment

  • Cause: the two seal seats are not concentric, or the sleeve was skewed during installation
  • Solution: reinstall and adjust both seal seats
  • Prevention: ensure alignment during installation and tighten both ends evenly

9.4 Low transmittance

  • Cause: dirty sleeve, fingerprint contamination, or sleeve quality problem
  • Solution: clean the sleeve or replace it
  • Prevention: clean before installation and operate with gloves

10. Longkang’s quartz sleeve installation commitments

  1. High-purity quartz sleeve with transmittance ≥90 percent
  2. Standardized installation process, identical on every unit
  3. Gloved handling to prevent contamination
  4. Fluororubber O-rings, resistant to ageing
  5. Torque-wrench tightening for a reliable seal
  6. Hydrostatic test on every unit to ensure no leakage
  7. Traceable installation records
  8. Long-term supply of original sleeves and seals
  9. Guidance on sleeve replacement

For selection support and quartz sleeve installation guidance, contact Longkang.

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong