Operating an in-line UV sterilizer is not complicated; the difficult part is the sequence. Get the order wrong and lamp life drops quickly while disinfection performance never reaches its target. The procedure below is set out in four stages: startup, operation, shutdown, and maintenance.

1. Three checks before startup

First, check the piping. Are all valves fully open, is the bypass tightly closed, and are there any leaks — especially on the first start after installation or maintenance? Second, check the electrical side: is the voltage stable, is grounding reliable, and is there condensation inside the control cabinet? Third, check the lamp-hour counter. When accumulated running hours approach the rated life, replace the lamps before starting up instead of hoping they will last a little longer.

Remember one rule: water first, lamps second. With no water in the chamber, heat from a lit lamp cannot dissipate and the quartz sleeve is heated locally; at best scaling accelerates, at worst a lamp or sleeve cracks.

2. Two numbers to watch during operation

Flow and intensity. If flow exceeds the rated value, residence time in the chamber shortens and the dose drops immediately — the lamp may still look lit while treatment is already out of specification. Check intensity using the online sensor or periodic spot measurements; when it falls below 70% of the initial value, take action: clean the sleeves first, then consider replacing the lamps.

Pressure also deserves attention. Every unit has a maximum pressure rating. When pump outlet pressure exceeds that rating, the chamber and seals remain under sustained load and leaks usually begin at the flange. State the condition when ordering so that a reinforced chamber can be supplied, rather than trying to cope with it on site.

3. Shutdown in reverse order

Switch off the lamps first, wait a few minutes for them to cool, and then stop the water. A short stop does not require draining; for an extended shutdown, empty the chamber and wipe the sleeves dry to prevent standing water from breeding biofilm. Where equipment is idle through a northern winter, trapped water can freeze and split the quartz sleeve — a lesson learned the hard way every year.

4. Cleaning and replacement

Scaling on a quartz sleeve develops gradually and cannot be seen by eye; the intensity reading falls first. Set the cleaning interval according to water quality: generally 3 to 6 months for tap water and 1 to 2 months for wastewater or hard water. The method is simple: remove the sleeve and wipe it with a soft cloth dipped in a neutral cleaner or diluted citric acid. Never use steel wool, since scratches become new starting points for scale.

When refitting, pay attention to the seals: even a slight twist will cause leakage. Do not touch the quartz part of a lamp with bare fingers; fingerprints bake into spots at high temperature and reduce light transmission. After reassembly, carry out a water pressure test, remeasure intensity, and record the results in the operation log.

5. Common operating mistakes

Frequent starts and stops. UV lamps are gas-discharge lamps, and every start shocks the electrodes; switching a unit on and off a dozen times a day noticeably shortens its life. Running with no water, as noted above, is the most likely cause of a cracked sleeve. Operating above the rated flow may look like faster treatment, but the dose is insufficient and acceptance testing exposes it immediately. Another mistake is replacing lamps without cleaning the sleeves: a new lamp in a dirty sleeve still cannot deliver the required intensity.

6. Verify the dose against actual flow

Many operating problems have their root cause in selection. For example, a unit rated at 30 m³/h with four 75 W lamps and an effective chamber length of 0.9 m: if actual flow rises to 36 m³/h, residence time falls by about 20% and the end-of-chamber dose drops from 42 mJ/cm² to roughly 33 mJ/cm², so the total bacterial count tends to fluctuate. The check is straightforward: fit a sampling port at both inlet and outlet, take samples on the same day, and compare them — the difference is the unit’s contribution.

Another case is a large pump matched with a small unit. An oversized pump gives high outlet pressure and excessive flow, so the equipment runs overloaded for long periods. Simply lowering pump frequency does not solve the problem: flow drops but pressure fluctuation grows. The right approach is to size the equipment for peak flow, not average flow.

7. What to record in the daily log

Four columns are enough: date, accumulated operating hours, intensity reading, and abnormal events. Accumulated hours determine when to change lamps; intensity determines when to clean sleeves; abnormal events help tell whether the water quality has changed or the equipment is degrading. One sheet every three months is sufficient, and when a problem arises a quick look back pinpoints it.

If the unit has a remote module, make sure alarms reach a person. An unattended pump room is worst served by an alarm nobody watches: a warning light left on for six months is no alarm at all.

Agree a spare-parts list together with the equipment: keep lamps equal to 10% of the total installed, quartz sleeves at 5%, and one set of seals per connection. These parts are inexpensive, but a single missing piece stops the water supply.

Contact Longkang for an operation card and spare-parts list matched to your model, along with selection support.

Add one more line to the operation card: anyone who touches a valve or the control cabinet signs the log, so responsibility can be traced.

Finally, store spares separately — keep lamps and quartz sleeves in separate boxes, standing upright; a broken sleeve is one sleeve less.

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong