Ozone Generator Safety Precautions and Operating Notes
This document describes the safety and protective measures for operating an ozone generator, covering ozone, oxygen, line voltage, high AC voltage, stored charges, and pressure hazards.
1. Essential safety precautions when operating the equipment
- Do not allow rubber seals (rubber and nitrile rubber) to come into direct contact with ozone; do not use silver-plated VCR gaskets.
- Do not use gases other than the gas specified for the equipment.
- Never allow any foreign matter to enter the ozone generator, and prevent catalyst particles from entering the ozone gas line.
2. Hazard: ozone
Ozone is mainly present in the gas lines, the ozone reaction cell, and the equipment connections.
Safety and protective measures
- Ensure the ventilation of the ozone cabinet works properly.
- Connect all inlet and outlet gas lines, using stainless steel (SS) non-silver-plated VCR gaskets.
- Do not open the external gas lines or equipment connections unless the unit has been purged with nitrogen.
- Before operating the ozone generator, always check and tighten all ozone lines.
- Verify that the unit stops the ozone generator when the ozone detector reads above the TLV setpoint.
Response to an ozone leak
- Stop the ozone generator by activating the external alarm signal or the emergency stop.
- Evacuate all personnel from the danger area.
- Do not enter the danger area without self-contained breathing equipment.
- Before entering the danger area, allow the ozone to decompose or dissipate naturally.
3. Hazard: oxygen
Oxygen is mainly present in the gas lines, the ozone reaction cell, and the equipment connections.
Safety and protective measures
- Connect all inlet and outlet gas lines, using stainless steel (SS) non-silver-plated VCR gaskets.
- If an open flame is present, do not open the external gas lines or equipment connections until the lines have been purged.
Response to an oxygen leak
Close the oxygen supply via the external valve.
4. Hazard: electric shock — line voltage
Line voltage is present at the terminal area on the rear of the ozone generator and at all electrical connections (including voltage-carrying circuit connections inside the generator).

Safety and protective measures
- If the ozone generator is powered, do not open the covers and touch electrical components.
- Never remove insulated covers while the ozone generator is running.
- Ensure that repair work is confirmed and a lockout/tagout notice is posted.
Note: even when the mains supply and the main switch are switched off, some circuit sections remain live:
- The terminal area of the ECOPS (G1) is live.
- The input terminals of the main switch S1 are live.
5. Hazard: electric shock — high AC voltage
High AC voltage is mainly present inside the ECOPS (G1), in the capacitors within the ECOPS, in the high-voltage cables, and in the circuits connecting the ozone cell.
Safety and protective measures
- If the ozone generator is powered, do not open the covers and touch electrical components.
- Never remove insulated covers while the ozone generator is running.
- Never operate the unit unless the high-voltage lines are correctly connected and isolated.
6. Hazard: electric shock — stored charges
Stored charges are present in the power supply of the ECOPS (G1).
Safety and protective measures
- Never service the ECOPS immediately after the unit has been de-energized.
- After de-energizing the unit, wait at least 10 minutes before opening the ECOPS for repair or replacement.
7. Hazard: physical pressure
Pressure hazards mainly exist in gas and water lines, the ozone reaction cell, and the equipment connections.
Safety and protective measures
Before opening gas lines, water lines, or equipment connections, relieve the pressure inside the unit.
Gas line
- Flush the line for at least 10 minutes until all ozone has been discharged.
- Close the oxygen supply via the external valve or the pressure regulating valve; if there is a nitrogen supply, close it as well.
- Release the gas pressure through the process line (open the process line valve).
- Wait until the pressure approaches ambient pressure.
Water line
- Close the cooling-water inlet and outlet valves.
- Slowly open the equipment connections so the cooling water drains into a prepared external drip tray.
- Wait until no residual water flows out of the connections.
Contact Longkang for ozone generator operation and safety documentation.