Ozone Generator Operation Safety Precautions

This article sets out the precautions to be observed when operating an ozone generator and handling the hazards associated with each function of the equipment.
1. Safety precautions to know before operating the equipment
- Do not allow rubber seals (natural rubber and nitrile rubber) to come into direct contact with ozone, and do not use silver-plated VCR gaskets.
- Do not substitute other gases for the gas specified for the equipment.
- Never allow any foreign substance to enter the ozone generator; prevent ozone catalyst from entering the ozone gas line.
2. Potential hazard — ozone
Ozone is mainly present in the gas pipelines, the ozone generating tubes and the equipment connections.
Safety and precautions for ozone:
- Ensure that the exhaust ventilation of the ozone cabinet is working properly.
- Connect all inlet and outlet gas pipelines and use stainless-steel, non-silver-plated VCR gaskets.
- Do not open external gas lines or equipment connecting lines unless SEMOZONE has been purged with nitrogen.
- Always check that all ozone lines are tightened before starting the generator.
- Check whether the ozone detection device will stop the generator if the ozone concentration exceeds the TLV set point.

Response to an ozone leak:
- Stop the generator by activating the external alarm signal or the emergency stop.
- Evacuate all personnel from the hazardous area.
- Do not enter the hazardous area without self-contained breathing apparatus.
- Allow the ozone to decompose or disperse naturally before entering the hazardous area.
3. Potential hazard — oxygen
Oxygen is mainly present in the gas pipelines, the ozone generating tubes and the equipment connections.
Safety and precautions for oxygen:
- Connect all inlet and outlet gas pipelines and use stainless-steel, non-silver-plated VCR gaskets.
- If an open flame is present, do not open external gas lines or equipment connecting lines until SEMOZONE has purged the lines.
Response to an oxygen leak: shut off the oxygen inlet through the external valve.
4. Potential hazard — electric shock (line voltage)
Line voltage is present at the terminal block at the rear of the ozone generator and in all circuit connection components, including the voltage circuits inside the generator.
Safety and precautions for line-voltage circuits:
- Do not open the equipment cover or touch electrical components while the generator is energised.
- Never remove insulating covers while the generator is running.
- Always lock out and hang a maintenance tag when carrying out servicing.
Even when the main power supply and main switch are off, some circuit parts remain live:
- Voltage is present in the ECOPS (G1) terminal area.
- Voltage is present at the input terminals of main switch S1.
5. Potential hazard — electric shock (high AC voltage)
High AC voltage is mainly present inside the ECOPS (G1), in the capacitors of the ECOPS, in the high-voltage cables and in the circuits connected to the ozone tubes.
Safety and precautions for high AC voltage circuits:
- Do not open the equipment cover or touch electrical components while the generator is energised.
- Never remove insulating covers while the generator is running.
- Do not operate AEMOZON unless the high-voltage wiring has been correctly connected and isolated.
6. Potential hazard — electric shock (stored charges)
Stored charges are the power source of the ECOPS (G1).
Safety and precautions for high AC voltage circuits:
- Do not service the ECOPS immediately after SEMOZONE has been switched off.
- After SEMOZONE is switched off, wait at least 10 minutes before opening the ECOPS for service or replacement.
7. Potential hazard — physical pressure
Pressure hazards exist mainly in the gas and water pipelines, the ozone reaction tubes and the equipment connections.
Safety and precautions for pressure: relieve the pressure inside SEMOZONE before opening gas lines, water lines or equipment connecting lines.
Gas line
- Purge the line for at least 10 minutes until all ozone has been removed.
- Close the oxygen inlet through the external valve or pressure-regulating valve, and close any nitrogen inlet as well.
- Release the gas pressure through the process line (open the process-line valve).
- Wait until the pressure approaches ambient pressure.
Water line
- Close the cooling-water inlet and outlet valves.
- Slowly open the equipment connection so that the cooling water drains into the designated external tray.
- Wait until no further water flows from the equipment connection.