Open-Channel UV Module Installation and Operation

This installation and operation guide covers open-channel UV modules: installation, operation and maintenance, lamp and quartz sleeve replacement, materials, and the cleaning and electrical systems.
1. Module installation (simplified method)
Place the complete module inside the channel trough and fix it to the upper surface of the trough with four bolts. The module center must coincide with the channel trough center.
2. Operation and maintenance
- Run at the specified supply voltage. Check each phase stays within 180–220 V so ballasts and lamps work normally.
- At the normal water level, all lamps must be fully submerged.
- Close the power switch, then the circuit power switch; the module is energized and starts.
- When closing the module circuit breaker, check that the LED indicators on the module’s electronic ballasts light normally; investigate any abnormality.
- If an audible/visual fault alarm occurs, shut the circuit power switch and clear the alarm. According to the module number shown on the alarm indicator, check whether the ballast LEDs of that module light; replace the faulty ballast or lamp (try the ballast first).
- To replace a lamp, lift the module out, unscrew the locking nuts at both ends of the faulty lamp, withdraw the quartz sleeve (do not lose the seals), and replace the lamp.
- Handle glass parts with extreme care when lifting or replacing tubes.
- All metal structures — control cabinet, lamp rack modules, etc. — must be properly earthed during installation.
- During operation the cooling fan of the control cabinet must run normally to keep the cabinet well ventilated.
- If a branch circuit breaker trips, the module seal of that branch may be leaking, dampening the circuit and triggering the earth-leakage breaker. Check and replace the module seal.
3. UV precautions
- Never switch the unit on and off frequently, especially within short intervals, to preserve lamp life.
- Protect your eyes when inspecting a lit lamp.
4. Lamp and quartz sleeve installation steps
- Fit the wired lamp socket, then insert one top-tube ring and two O-ring seals into the threaded (tapered) joint hole.
- Pass the quartz sleeve with the lamp already inside through the threaded joint hole from the other end. Slide a through-hole gland and a bowl-shaped seal onto the sleeve, about 50 mm from the sleeve mouth.
- Plug the lamp socket onto the lamp pins, insert the quartz sleeve into the tapered joint (it must pass through the two O-rings and over the top-tube ring), then tighten the gland by hand until firm.
- Slide a bowl-shaped seal over the closed end of the sleeve and tighten the blind gland by hand until firm.
5. System structure and materials
- All metal in contact with water in the UV system is 316L; metal not in contact with wastewater is 304.
- Lamp sockets, power sockets, and lamp wiring are fully enclosed inside the lamp module, so they are never exposed to wastewater or UV light.
- Components exposed to UV-carrying water — the module frame, quartz sleeve O-rings (UV-resistant rubber), quartz sleeves (SiO₂), cleaning frame (316L), and UV-resistant wiper rings — are all UV-resistant materials. Lamps sit inside the sleeves, which protect them. Sleeves are fully submerged in the channel, with electrodes completely immersed so the wastewater cools them naturally, keeping both electrodes at the same temperature. Parts and spares are machined to design tolerances and are interchangeable.
5.1 UV lamp modules
Each module contains UV lamps, sleeves, a module rack, and a mechanical automatic cleaning device; ballasts are housed separately in the ballast cabinet. Each lamp sits in its own quartz sleeve with one closed end and one end sealed by the lamp mechanical (rubber) seal. Sleeves are fixed to the frame by UV-resistant nuts and compression O-rings and are backed off at the rear so no rigid contact with the frame occurs — vibration cannot crack the sleeve, and the sleeve cannot slip out during wiping. No sleeve protrudes beyond the steel structure at either side of the rack. Lamp cables terminate in the ballast cabinet above the modules, protection class IP65 or better, watertight. The whole rack is 316L stainless steel, installed above the wastewater; modules simply rest on the rack without bolting. The design allows operators to replace lamps and sleeves easily. Reflective panels on the rack top prevent UV from escaping the channel in an accident. Each module hangs above the wastewater without fastening, so it can be lifted out individually without disturbing other modules.
5.2 UV lamps
- Type: low-pressure high-output, amalgam lamps, pre-heated to extend life.
- Guaranteed life ≥12,000 hours (actual life depends on operating conditions).
- 253.7 nm low-pressure high-output lamps with low electrical noise and low energy consumption; each new lamp rated 320 W including ballast and auxiliary power.
- Output of each lamp adjustable continuously across 50–100%.
- Output varies less than 3% over wastewater temperatures of 3–35 °C.
- Clip-type filament design with unique curling for shock resistance.
- All electrical connections at one end only, for easy replacement.
- Four-pin connectors at every joint prevent leakage and short circuits.
- Zero-ozone lamps.
5.3 Quartz sleeves and sealing
- Material: Quartz 214.
- The open end is sealed by a UV-resistant nut, steel collar, and compression O-ring.
- Sleeves are straight tubes, open at one end only, reducing seal points and leakage risk; the double seal ensures reliability.
- Sleeve wall thickness 1.5 mm.
- To replace a sleeve or lamp, lift the rack onto the maintenance stand, remove the tail cap with the special wrench, unscrew the sleeve sealing nut, wet the sleeve surface to reduce friction, and pull it out; the procedure is identical for every rack regardless of lamp count.
- Sleeve nuts are knurled for hand tightening; no tools are needed, and lamps are fitted or removed from the open end.
- Lamps are held by a molded PVC socket with a double seal; the design prevents any contact between the quartz sleeve and steel parts.
- Three-stage sealing among lamp, sleeve, and rack prevents water entering the rack if a sleeve breaks, which would affect other lamps; the second seal isolates a broken lamp from the rack and the other lamp circuits.
- Sleeve sealing class IP68; light transmittance above 90%, and the sleeves do not age from the UV system.
- One end open, the other a naturally closed domed end.
- Maximum operating pressure: not more than 2 bar.
5.4 Module racks
- Entire rack of 316L stainless steel, installed above the wastewater; modules rest on the rack without fastening.
- A top cover on the rack prevents UV from escaping the channel.
- Each module hangs independently and unfastened, so it can be lifted out alone for lamp or sleeve replacement.
5.5 Automatic cleaning system
The mechanical wiper system cleans online during normal operation without affecting disinfection. It reduces manual cleaning, extends uptime, and lowers labor and running cost. A compressor-driven cylinder moves the wiper carriage back and forth along the drag rod, scrubbing deposits off the outer sleeve surface so UV transmittance is never reduced and disinfection is continuous.
- Pneumatic drive: high-quality components; low-friction, highly corrosion-resistant cylinders with stainless steel piston rods running smoothly and reliably.
- Cylinder guides: stainless steel guide rods with high-polymer (PTFE-based) bushes — lubrication-free, dirt-resistant, maintenance-free, highly reliable.
- Operating pressure: minimum 2.5 kgf/cm², system line pressure set around 4–6 kg/cm².
- Wiper rings are UV-resistant rubber; wiping frequency adjustable on site from 10 to 500 strokes per week, controlled automatically or manually via a microcomputer timing system. The cleaning rack is 304 stainless steel.
5.6 Electrical and control system
The electrical section comprises power distribution, central control, ballasts, pneumatic control, a cross-channel junction box, and one air compressor.
Power distribution:
- Average power of the UV system (lamps, power distribution, control, and auxiliaries) not less than 8 kW.
- The ballast cabinet connects to the central control cabinet by a control power cable through which the central cabinet switches the ballast circuits, controlling module operating states.
- The power control module includes power distribution, ballasts, signal transmission, and lamp inspection.
- The power control module feeds each rack through distribution connectors.
- Incoming supply 220 V, 50 Hz, fed from the plant to the distribution center with capacity meeting the design; the center comprises distribution protection switches, contactors, fuses, filters, etc.
- Each ballast cabinet is connected at 220 V, 50 Hz.
- All breakers and distribution components are low-voltage; terminal blocks are single- or double-level or fused cage-clamp spring terminals for reliable connection.
- The automatic cleaning system is driven by a water pump.
- Fuse and earth-detection boards are installed in the distribution center.
- Distribution center enclosure: stainless steel, all internal components sealed from the environment.
- Protection class IP54 or better; maximum ambient temperature 50 °C.
- System control center supply: 220 VAC; distribution center supply: 220/380 VAC.
- The supplier completes all wiring between lamps and ballasts and provides all cables and conduits between them.
Electronic ballasts:
- German technology.
- Microprocessor-controlled, high power factor (≥0.98).
- Stainless steel cabinet, protection class IP54 or better; maximum ambient temperature 50 °C, no external cooling air required.
- On any lamp failure, the ballast retries twice automatically.
- Each ballast independently controls one lamp, reports its status to the data-acquisition board.
- Parameters: input 220 V AC ±10%, 50/60 Hz; output 320 W adjustable 50–100%; power factor 0.98.
- All lamp-ballast wiring is tested before delivery.
Contact Longkang for sizing support and quotations.