A recent field review of wastewater treatment plants found that discharge volumes in Shijiazhuang exceed treatment capacity. Combined stormwater and sewer lines add to the load, while uneven management arrangements and tight operating funds create risks for stable operation.

1. Design capacity does not match actual throughput

The Qiaodong wastewater treatment plant is the largest of the city’s four plants, with a design capacity of 500,000 m3 per day. In practice it runs above capacity: average daily throughput was 502,000 m3 in January, 503,700 m3 in February and 503,300 m3 in March. As industrial development extends eastwards, wastewater generation in the Qiaodong area continues to grow. Even with the plant overloaded, part of the local wastewater remains untreated and is discharged directly.

By contrast, the Qiaoxi plant is underloaded. Its design capacity is 360,000 m3 per day but actual throughput is only 260,000 to 280,000 m3 per day, leaving nearly 100,000 m3 per day unused. Because the terrain is higher in the west and lower in the east, wastewater from the Qiaodong area cannot easily reach the Qiaoxi plant.

Overall, the city discharges about 920,000 m3 per day, of which about 850,000 m3 is treated and about 70,000 m3 is discharged untreated. A new treatment plant is planned for the Qiaodong area to share the load.

2. Industrial wastewater costs more and sludge disposal lacks funding

Treatment cost at the Qiaodong and Qiaoxi plants is about 0.5 to 0.6 yuan per m3. Because operating costs are covered by budget allocations, the two plants can roughly break even. At the high-tech zone plant, however, more than 80 percent of the incoming wastewater comes from pharmaceutical and chemical industries, so costs are notably higher: 0.93 yuan per m3 in 2010 and 0.91 yuan per m3 in 2011.

Fee collection is another difficulty. In 2011 the plant treated 21.63 million m3 of wastewater, of which 9.51 million m3 could not be accounted for. This means more than 40 percent of the wastewater entered the municipal network without payment of treatment fees.

Sludge disposal is an increasingly urgent issue. The Qiaoxi plant produces more than 200 tonnes of sludge per day and the Qiaodong plant more than 500 tonnes. Both report that they lack the means to build dedicated sludge disposal facilities and currently only haul the sludge away for landfill or stockpiling. Specialists warn that if the growing volumes of sludge are not handled properly, they will cause secondary pollution of soil and groundwater. Lined landfill and drying with incineration are relatively mature options, but every route requires sustained funding.

3. Combined sewers and unclear oversight add pressure

Spring rainfall sends large volumes of stormwater into the treatment plants through the network. Rapid urban growth has produced closely interleaved industrial and residential zones, and the shared use of stormwater and sewer pipelines seriously complicates drainage management. Stormwater not only increases hydraulic load but also scours deposited sludge from the pipes, creating transient high-strength wastewater that can damage the activated biomass in biological treatment and reduce treatment performance. Separating stormwater from sewage is therefore a priority.

The city now has a wastewater treatment plant in every county, with 26 plants formally in operation and a total capacity of 805,700 m3 per day. These plants fall under several different administrators, including urban construction, environmental and forestry departments. Some plants are operated by the same departments responsible for oversight, which makes it difficult to establish effective independent supervision. Specialists involved in the review have expressed concern about this arrangement.

4. What the findings mean for plant operators

For operators and equipment suppliers, the review highlights several practical lessons:

  • Size treatment capacity against actual catchment flows, including industrial growth and peak wet-weather loads
  • Keep separate stormwater and sewer networks wherever possible to protect biological treatment
  • Secure a stable fee and funding mechanism before committing to higher treatment standards
  • Plan sludge treatment and disposal together with the liquid treatment line
  • Design clear, independent operating and supervision responsibilities for every facility

Longkang supplies process equipment and selection support for municipal and industrial wastewater treatment. Contact us for assistance in evaluating capacity, disinfection and sludge-handling requirements.

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong