Wastewater Plant Inspection Findings and Compliance Priorities

Effluent sampling at a municipal wastewater treatment plant
Compliance findings from a wastewater plant inspection

A recent inspection covered 15 wastewater treatment plants in 11 counties and districts that discharge into the Xiao River, the Wangyang ditch and the lower Hutuo River. Apart from two plants shut down for maintenance, nine plants showed operational problems of varying degree: the Qiaodong and Qiaoxi plants, the high-tech zone plant, the Liangcun development zone plant, the Gaocheng plant, the Wuji plant, the Zhaoxian plant, the Zhengding plant and a pharmaceutical waste treatment centre.

1. Main problems found

1.1 Influent commonly exceeds design values

Eight plants received influent above their design limits. At the high-tech zone plant, influent COD reached 1917 mg/L, 5.4 times the design value. The main cause is that some enterprises within the collection area do not operate their treatment facilities properly and discharge untreated high-strength wastewater at night, through hidden pipes or by tanker truck.

1.2 Effluent commonly exceeds discharge limits

Eight plants produced effluent above the applicable standard. At the pharmaceutical waste treatment centre, effluent COD reached 1263 mg/L, 3.2 times the limit. At the Zhaoxian plant, where the influent met design values, effluent COD reached 167 mg/L, 0.67 times above the limit. The investigation found two contributing factors: severe influent overload that undermines treatment performance, and poor operation and management at the plants themselves.

1.3 Automatic monitoring data are unreliable

At every plant inspected, real-time COD data from automatic monitors at the inlet and outlet were inaccurate and generally lower than manual sampling results, with readings mostly below the effluent standard. Common issues included improperly located sampling points, infrequent calibration and comparison against manual samples, and delayed maintenance. As a result, the automatic monitoring data had lost their value as a control tool.

2. Consequences of poor plant performance

Wastewater treatment plants are the last barrier before effluent enters the environment. In many areas, especially in the Ziya River basin, there is little year-round surface runoff and little ecological water supply, so the quality of plant effluent directly determines the quality of downstream rivers. When plants fail to operate stably and discharge above limits, regional water quality cannot improve and communities along and below the rivers are exposed to harm.

Since February, COD at the Xiao River section entering Xingtai had remained above the 200 mg/L assessment standard. Monitoring bulletins recorded 439 mg/L at the Biancun section on 24 March and 729 mg/L at the Dongzaocun section of the Wangyang ditch on 29 March. Poor operation at another plant also posed a serious pollution threat to a nearby canal. In the first quarter, one city in the basin was required to pay an ecological compensation levy of 2.7 million yuan, directly linked to unstable plant operation and excess discharge.

Unstable compliance also undermines pollution reduction targets. Plant construction provides the basis for load reduction, stable operation is the key, and compliant discharge is the guarantee. When plants exceed limits, the credited reduction is proportionally reduced according to the number of exceedances, affecting the achievement of broader reduction targets.

In addition, reliable treatment is a precondition for approving new water-using projects. A plant that does not deliver the expected load reduction can delay environmental approval for new developments and affect local economic growth. Finally, municipal plants represent substantial public investment; facilities that stand idle or operate irregularly waste funding that is difficult to secure.

3. Corrective priorities

With a growing number of plants in service, strengthening operation and management so that facilities run normally and deliver their intended benefit is an important task for the sector. The inspection identified several areas for improvement:

  • Give priority to plant operation management, review local problems and take timely corrective action
  • Develop practical operation and management mechanisms suited to local conditions and implement wastewater charging policies fully
  • Strengthen control of influent and effluent quality, supervise enterprises in the collection area and prevent hidden or excessive discharges
  • Increase site inspections and sampling, and keep automatic monitoring equipment correctly installed, calibrated and maintained
  • Correct abnormal operation and excess discharge promptly, and verify that corrective measures are effective
  • Accelerate market-oriented operation by encouraging participation from different forms of investment and by using project financing models such as build-operate-transfer

Plants with recurring or long-term non-compliance should be required to rectify the situation within a defined period. During rectification, approval for new water-related projects in the affected collection area may be suspended until performance is restored.

Longkang provides monitoring, disinfection and process support for wastewater treatment plants. Contact us for selection and compliance advice.

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong