UV Sterilizer Installation in Secondary Water Supply Pump Rooms

UV sterilizer mounted on the pump outlet main inside a secondary water supply pump room
UV installation points in a secondary supply pump room

Secondary water supply is one of the main application scenarios for UV sterilizers, and installation in a pump room has its own specific requirements. Longkang has accumulated extensive installation experience in secondary water supply projects. This article explains the key points for installing a UV sterilizer in a secondary water supply pump room.

1. Overview of secondary water supply systems

1.1 What is secondary water supply

  • Secondary water supply is a method of supplying water to users after municipal water has been stored and pressurized
  • Applicable to high-rise buildings, residential communities and commercial complexes
  • System composition: storage tank (or water tank) → booster pump → UV sterilizer → users
  • The UV sterilizer is installed after the booster pump and before the users

1.2 Choosing the disinfection position

  • Recommended position: on the booster pump outlet main
  • Advantages:
    • Stable pressure (0.3–0.6 MPa downstream of the pump)
    • All outgoing water is disinfected
    • Avoids secondary contamination in the water tank
  • Not recommended: the tank inlet (municipal water is already disinfected, so treatment would be duplicated)
  • Optional: the tank outlet (disinfects water leaving the tank)

2. Pump room environment requirements

2.1 Room conditions

  • Indoor installation, dry and well ventilated
  • Ambient temperature: 5–40 °C
  • Ambient humidity: ≤90% RH (no condensation)
  • Floor: cement, level and even
  • Drainage: provide a floor drain or drainage channel in the pump room
  • Lighting: adequate illumination (≥200 lux)
  • Space: reserve at least 0.5 m of maintenance clearance around the equipment

2.2 Installation position

  • Close to the booster pump outlet main
  • Easy to operate and maintain
  • Away from the water pump, to reduce vibration effects
  • Install the equipment horizontally
  • Fix it on a foundation or support

2.3 Piping layout

  • Install the sterilizer on the outlet main
  • Provide a Y-type filter before the equipment (to protect the quartz sleeve)
  • Install valves before and after the equipment (butterfly or gate valves)
  • Provide a bypass line beside the equipment, so supply is not interrupted during maintenance
  • Fit a valve on the bypass line
  • Install a pressure gauge before the equipment
  • Install a pressure gauge after the equipment

3. Equipment selection

3.1 Treatment capacity calculation

  • Calculate on the basis of the maximum daily and maximum hourly water consumption of the community
  • Formula: Q = q × N × Kh
  • q: water-use quota (L/person·day), generally 150–200
  • N: number of water users
  • Kh: hourly variation coefficient, generally 2.0–2.5
  • Alternatively, select by the rated flow of the booster pump (sterilizer capacity ≥ pump flow)

3.2 Selection example

  • Community: 1,000 households, 3 persons per household, 3,000 persons in total
  • Water-use quota: 180 L/person·day
  • Maximum daily consumption: 3,000 × 180 = 540 m³/d
  • Maximum hourly consumption: 540 ÷ 24 × 2.3 = 51.75 m³/h
  • Selected sterilizer: LK-UV-50 (50 m³/h) or LK-UV-60
  • Booster pump flow: 50 m³/h, a match

3.3 Standby configuration

  • Important projects: one duty unit plus one standby unit (two sterilizers in parallel)
  • When one unit is under maintenance, the other runs
  • Automatic changeover (motorized valve plus control)
  • General projects: a single unit plus a bypass (temporary bypass during maintenance)

4. Installation steps

4.1 Foundation construction

  • Concrete foundation or steel-section support
  • Foundation size: 100 mm larger than the equipment base
  • Foundation height: 0.3–0.5 m, for easy operation and drainage
  • Levelness: ≤2 mm/m
  • Embed expansion bolts in the foundation

4.2 Positioning the equipment

  • Move the equipment into the pump room, taking care to protect it
  • Lift it or move it manually
  • Place it on the foundation
  • Level it with a spirit level
  • Fix it with expansion bolts

4.3 Pipe installation

  • Connect the inlet pipe to the equipment inlet
  • Connect the outlet pipe to the equipment outlet
  • Flanged connections for large diameters, threaded connections for small diameters
  • Provide independent supports for the pipes
  • Install the valves, filter and pressure gauges
  • Install the bypass line

4.4 Electrical installation

  • Draw power from the pump room distribution box
  • Protect the cables with conduit
  • Connect to the equipment control box
  • Provide a reliable earth connection
  • If remote monitoring is required, connect the communication cable

4.5 Water commissioning

  • Check the pipe connections
  • Open the inlet valve and vent the air
  • Check for leakage
  • Energize the system and run it
  • Check the operating parameters
  • Test the water quality

5. Special requirements for pump room installation

5.1 Waterproofing

  • Water splashes may occur in the pump room
  • Equipment control box rated IP65
  • Use waterproof cable glands at cable entries
  • Do not place the equipment directly on the floor (raise it on a foundation)
  • Provide drainage in the pump room

5.2 Moisture protection

  • The pump room has relatively high humidity
  • Protect the equipment interior against moisture with desiccant
  • Heating and dehumidification inside the control box (optional)
  • Maintain good ventilation

5.3 Vibration control

  • Water pump operation generates vibration
  • Keep the equipment at a distance from the pump
  • Provide flexible connections in the piping (rubber flexible joints)
  • Isolate the equipment foundation with vibration damping pads

5.4 Freeze protection

  • Pump rooms in northern regions can be cold in winter
  • Heat the pump room (temperature ≥5 °C)
  • Insulate the equipment if needed
  • Drain all stored water when the system is out of service for a long period

5.5 Electromagnetic interference protection

  • The pump room contains frequency converters, pumps and other equipment
  • Use shielded cable for the equipment communication lines
  • Keep away from strong electromagnetic sources
  • Ensure reliable grounding

6. Coordination with other equipment

6.1 Coordination with the water tank

  • Connect the tank outlet to the sterilizer
  • Tank level controls the pump
  • The sterilizer starts in linkage with the pump
  • The sterilizer stops with a delay after the pump stops

6.2 Coordination with the pump

  • Install the sterilizer on the pump outlet
  • Match the pump flow with the sterilizer capacity
  • Pump pressure must meet the sterilizer pressure rating (≤1.0 MPa)
  • Use a soft pump start to reduce water hammer

6.3 Coordination with the control cabinet

  • The sterilizer can be connected to the secondary supply control cabinet
  • Linkage control (pump start → sterilizer start)
  • Status feedback (running or fault)
  • Remote monitoring

6.4 Coordination with water quality monitoring

  • Online residual chlorine and turbidity monitoring
  • Alarm on abnormal water quality
  • UV intensity monitoring
  • Data upload

7. Acceptance criteria

7.1 Installation acceptance

  • Equipment in the correct position and firmly fixed
  • Correct pipe connections with no leakage
  • Valves open and close smoothly
  • Filter installed correctly
  • Bypass line functions normally
  • Correct electrical wiring and reliable grounding
  • Clear labelling

7.2 Operation acceptance

  • Normal water and power supply
  • All lamps light up
  • Normal operating parameters (pressure, flow and UV intensity)
  • No abnormal noise or vibration
  • Two hours of continuous operation without abnormality
  • Normal linkage control

7.3 Water quality acceptance

  • Total bacterial count in effluent: ≤100 CFU/mL (GB 5749)
  • Total coliforms: not detected
  • Colour, turbidity and odour normal
  • Third-party testing if required

7.4 Documentation handover

  • Product certificate of conformity and instruction manual
  • Test report
  • Installation acceptance record
  • Water quality test report
  • Warranty card

8. Longkang’s secondary water supply project experience

  1. Dual production bases in Xianning and Guangzhou, serving customers nationwide
  2. Experience in hundreds of secondary water supply projects
  3. Familiarity with CJJ 140, the technical code for secondary water supply engineering
  4. Full-process service from selection through installation
  5. On-site survey and scheme design available
  6. Professional installation team
  7. Comprehensive after-sales service
  8. Long-term supply of spare parts

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong