UV Sterilizer Installation in Secondary Water Supply Pump Rooms

Secondary water supply is one of the main application scenarios for UV sterilizers, and installation in a pump room has its own specific requirements. Longkang has accumulated extensive installation experience in secondary water supply projects. This article explains the key points for installing a UV sterilizer in a secondary water supply pump room.
1. Overview of secondary water supply systems
1.1 What is secondary water supply
- Secondary water supply is a method of supplying water to users after municipal water has been stored and pressurized
- Applicable to high-rise buildings, residential communities and commercial complexes
- System composition: storage tank (or water tank) → booster pump → UV sterilizer → users
- The UV sterilizer is installed after the booster pump and before the users
1.2 Choosing the disinfection position
- Recommended position: on the booster pump outlet main
- Advantages:
- Stable pressure (0.3–0.6 MPa downstream of the pump)
- All outgoing water is disinfected
- Avoids secondary contamination in the water tank
- Not recommended: the tank inlet (municipal water is already disinfected, so treatment would be duplicated)
- Optional: the tank outlet (disinfects water leaving the tank)
2. Pump room environment requirements
2.1 Room conditions
- Indoor installation, dry and well ventilated
- Ambient temperature: 5–40 °C
- Ambient humidity: ≤90% RH (no condensation)
- Floor: cement, level and even
- Drainage: provide a floor drain or drainage channel in the pump room
- Lighting: adequate illumination (≥200 lux)
- Space: reserve at least 0.5 m of maintenance clearance around the equipment
2.2 Installation position
- Close to the booster pump outlet main
- Easy to operate and maintain
- Away from the water pump, to reduce vibration effects
- Install the equipment horizontally
- Fix it on a foundation or support
2.3 Piping layout
- Install the sterilizer on the outlet main
- Provide a Y-type filter before the equipment (to protect the quartz sleeve)
- Install valves before and after the equipment (butterfly or gate valves)
- Provide a bypass line beside the equipment, so supply is not interrupted during maintenance
- Fit a valve on the bypass line
- Install a pressure gauge before the equipment
- Install a pressure gauge after the equipment
3. Equipment selection
3.1 Treatment capacity calculation
- Calculate on the basis of the maximum daily and maximum hourly water consumption of the community
- Formula: Q = q × N × Kh
- q: water-use quota (L/person·day), generally 150–200
- N: number of water users
- Kh: hourly variation coefficient, generally 2.0–2.5
- Alternatively, select by the rated flow of the booster pump (sterilizer capacity ≥ pump flow)
3.2 Selection example
- Community: 1,000 households, 3 persons per household, 3,000 persons in total
- Water-use quota: 180 L/person·day
- Maximum daily consumption: 3,000 × 180 = 540 m³/d
- Maximum hourly consumption: 540 ÷ 24 × 2.3 = 51.75 m³/h
- Selected sterilizer: LK-UV-50 (50 m³/h) or LK-UV-60
- Booster pump flow: 50 m³/h, a match
3.3 Standby configuration
- Important projects: one duty unit plus one standby unit (two sterilizers in parallel)
- When one unit is under maintenance, the other runs
- Automatic changeover (motorized valve plus control)
- General projects: a single unit plus a bypass (temporary bypass during maintenance)
4. Installation steps
4.1 Foundation construction
- Concrete foundation or steel-section support
- Foundation size: 100 mm larger than the equipment base
- Foundation height: 0.3–0.5 m, for easy operation and drainage
- Levelness: ≤2 mm/m
- Embed expansion bolts in the foundation
4.2 Positioning the equipment
- Move the equipment into the pump room, taking care to protect it
- Lift it or move it manually
- Place it on the foundation
- Level it with a spirit level
- Fix it with expansion bolts
4.3 Pipe installation
- Connect the inlet pipe to the equipment inlet
- Connect the outlet pipe to the equipment outlet
- Flanged connections for large diameters, threaded connections for small diameters
- Provide independent supports for the pipes
- Install the valves, filter and pressure gauges
- Install the bypass line
4.4 Electrical installation
- Draw power from the pump room distribution box
- Protect the cables with conduit
- Connect to the equipment control box
- Provide a reliable earth connection
- If remote monitoring is required, connect the communication cable
4.5 Water commissioning
- Check the pipe connections
- Open the inlet valve and vent the air
- Check for leakage
- Energize the system and run it
- Check the operating parameters
- Test the water quality
5. Special requirements for pump room installation
5.1 Waterproofing
- Water splashes may occur in the pump room
- Equipment control box rated IP65
- Use waterproof cable glands at cable entries
- Do not place the equipment directly on the floor (raise it on a foundation)
- Provide drainage in the pump room
5.2 Moisture protection
- The pump room has relatively high humidity
- Protect the equipment interior against moisture with desiccant
- Heating and dehumidification inside the control box (optional)
- Maintain good ventilation
5.3 Vibration control
- Water pump operation generates vibration
- Keep the equipment at a distance from the pump
- Provide flexible connections in the piping (rubber flexible joints)
- Isolate the equipment foundation with vibration damping pads
5.4 Freeze protection
- Pump rooms in northern regions can be cold in winter
- Heat the pump room (temperature ≥5 °C)
- Insulate the equipment if needed
- Drain all stored water when the system is out of service for a long period
5.5 Electromagnetic interference protection
- The pump room contains frequency converters, pumps and other equipment
- Use shielded cable for the equipment communication lines
- Keep away from strong electromagnetic sources
- Ensure reliable grounding
6. Coordination with other equipment
6.1 Coordination with the water tank
- Connect the tank outlet to the sterilizer
- Tank level controls the pump
- The sterilizer starts in linkage with the pump
- The sterilizer stops with a delay after the pump stops
6.2 Coordination with the pump
- Install the sterilizer on the pump outlet
- Match the pump flow with the sterilizer capacity
- Pump pressure must meet the sterilizer pressure rating (≤1.0 MPa)
- Use a soft pump start to reduce water hammer
6.3 Coordination with the control cabinet
- The sterilizer can be connected to the secondary supply control cabinet
- Linkage control (pump start → sterilizer start)
- Status feedback (running or fault)
- Remote monitoring
6.4 Coordination with water quality monitoring
- Online residual chlorine and turbidity monitoring
- Alarm on abnormal water quality
- UV intensity monitoring
- Data upload
7. Acceptance criteria
7.1 Installation acceptance
- Equipment in the correct position and firmly fixed
- Correct pipe connections with no leakage
- Valves open and close smoothly
- Filter installed correctly
- Bypass line functions normally
- Correct electrical wiring and reliable grounding
- Clear labelling
7.2 Operation acceptance
- Normal water and power supply
- All lamps light up
- Normal operating parameters (pressure, flow and UV intensity)
- No abnormal noise or vibration
- Two hours of continuous operation without abnormality
- Normal linkage control
7.3 Water quality acceptance
- Total bacterial count in effluent: ≤100 CFU/mL (GB 5749)
- Total coliforms: not detected
- Colour, turbidity and odour normal
- Third-party testing if required
7.4 Documentation handover
- Product certificate of conformity and instruction manual
- Test report
- Installation acceptance record
- Water quality test report
- Warranty card
8. Longkang’s secondary water supply project experience
- Dual production bases in Xianning and Guangzhou, serving customers nationwide
- Experience in hundreds of secondary water supply projects
- Familiarity with CJJ 140, the technical code for secondary water supply engineering
- Full-process service from selection through installation
- On-site survey and scheme design available
- Professional installation team
- Comprehensive after-sales service
- Long-term supply of spare parts