Custom Selection Services for Open-Channel UV Disinfection Systems

Every wastewater treatment project differs in flow rate, water quality, site conditions, and effluent requirements, so standardized equipment often cannot fully meet project needs. As a specialist manufacturer of open-channel UV disinfection systems, Longkang provides end-to-end customization covering consultation, design, production, installation, and commissioning, so that each project receives a disinfection solution matched to its conditions. This article describes Longkang’s custom selection and engineering capabilities for open-channel UV disinfection systems.
1. Why Custom Selection Is Required
1.1 Project conditions vary widely
- Flow rates from 100 m³/h to over 10,000 m³/h
- UV transmittance (UVT) from 40% to 85%
- Suspended solids (SS) from 5 mg/L to 50 mg/L
- Effluent standards ranging from Class 1B to special discharge limits
- Site conditions vary (channel dimensions, available space, power supply)
- Standardized equipment cannot cover every scenario
1.2 Value of custom selection
- Assured disinfection performance: design based on actual project water quality and flow, with an accurately sized dose
- Controlled capital cost: neither over-designed nor under-designed, keeping investment proportionate
- Lower operating cost: optimized lamp count and power for energy-efficient operation
- Improved reliability: targeted redundancy so a single fault does not interrupt water flow
- Site compatibility: customized channel dimensions and mounting arrangements make full use of available space
- Special requirements: explosion-proof, corrosion-resistant, high-temperature, and high-salinity operating conditions
2. Longkang’s Custom Selection Service Process
2.1 Initial consultation (1–2 days)
- A technical engineer is assigned to review the basic project information
- Data collection: flow rate, water quality test reports, effluent standard, site drawings, system diagrams
- Technical questions answered
- Response within 24 hours and a preliminary proposal within 3 working days
2.2 On-site survey (large projects, 1–2 days)
- Complimentary on-site survey (capacity ≥1,000 m³/h or complex projects)
- Measurement of channel dimensions, available space, and power supply conditions
- Review of existing system operating conditions
- Water sampling (where UVT testing is required)
- Coordination of requirements with the owner and the design institute
- Issue of a survey report
2.3 Proposal design (3–7 days)
- UV dose calculation (based on UVT and effluent requirements)
- Lamp type selection (low-pressure high-output / medium-pressure)
- Module configuration design (quantity and arrangement)
- Channel dimension design (width, depth, length)
- Control system design (local / remote / automatic dimming)
- Cleaning system design
- Water level control design
- Issue of a detailed technical proposal, including:
- Proposal description
- Dose calculation report
- Equipment configuration list
- Channel layout drawing
- Electrical schematic
- Installation dimension drawing
- Operating cost analysis
- Investment estimate
2.4 Proposal review and adjustment (1–3 days)
- Presentation of the proposal to the owner and design institute
- Proposal revised in response to feedback
- Technical and economic comparison of multiple options (e.g., low-pressure vs. medium-pressure)
- Final proposal confirmed
- Technical agreement signed
2.5 Manufacturing (20–40 days)
- Production against approved drawings
- Quality control at critical process stages
- Customers may witness production at the factory
- Production progress tracking (weekly reports)
- Factory acceptance testing of the complete unit, with a test report
- Packaging and shipping
2.6 Installation and handover (7–20 days)
- Installation guidance (remote or on-site), or installation by a professional team
- Equipment positioning, pipe connections, electrical wiring
- Commissioning (water flow, power, parameter setting)
- Automatic cleaning commissioning
- Water level control commissioning
- Remote monitoring integration
- Water quality testing (with a third party)
- Complete acceptance documentation
2.7 After-sales service (long term)
- Warranty of 1 year (complete unit); lamps warranted for 8,000 hours or 1 year
- 24-hour technical support
- On-site repair service
- Scheduled follow-up visits and maintenance (quarterly / semi-annually)
- Genuine spare parts supply
- Lifetime technical support
- Equipment upgrade and retrofit service
3. Scope of Longkang’s Customization Capabilities
3.1 Treatment capacity
- Standard capacity: 50–10,000 m³/h
- Custom capacity: above 10,000 m³/h (multiple channels in parallel)
- Precise design to the project flow rate
- Phased construction supported (expansion interfaces reserved)
3.2 Lamp types
- Low-pressure high-output lamps: 150–320 W
- Medium-pressure lamps: 1–10 kW
- Imported lamps: Philips, Heraeus, Trojan
- Domestic lamps: Cnlight, Youhui
- Hybrid configuration: medium-pressure combined with low-pressure high-output
- Selection based on water quality and budget
3.3 Channels
- Concrete channels: channel design drawings supplied, with civil works by the owner
- Prefabricated stainless steel channels: factory-built for rapid on-site installation
- Channel dimensions: customized to treatment capacity and module count
- Channel material: 304 / 316L stainless steel
- Channel configuration: single channel / multiple channels in parallel
- Adaptable to existing channels (retrofit of older plants)
3.4 Modules
- Lamps per module: 4 / 8 / 12 / 16 (low-pressure) or 2 / 4 (medium-pressure)
- Module dimensions: customized to channel width
- Module frame: 316L stainless steel
- Cleaning device: independent automatic cleaning for each module
- Special-size modules available (to suit existing channels)
3.5 Control methods
- Manual control (standard)
- PLC automatic control with touch screen
- Automatic dimming (power adjusted to flow / UVT)
- Remote monitoring (RS485 / 4G / fiber optic)
- Integration with SCADA / DCS systems (Modbus / Profibus / OPC)
- Mobile app monitoring
- Data logging and historical analysis
- Fault diagnosis and alarms
- Control logic customized to owner requirements
3.6 Cleaning systems
- Electric automatic cleaning (standard)
- Pneumatic automatic cleaning
- Adjustable cleaning frequency (1–4 times per day)
- Online chemical cleaning (for heavily scaling water)
- Cleaning performance monitoring
- Cleaning scheme customized to water quality
3.7 Water level control
- Overflow weir control (simple and reliable)
- Water level sensor with module lifting (precise control)
- Water level sensor with control valve
- Water level balancing across multiple channels
- Water level fluctuation within ±5 mm
3.8 Special operating conditions
- High-temperature water (up to 80°C): heat-resistant seals and cables
- High-salinity / seawater: 316L stainless steel with special coating
- Explosion-proof environments (ExdIIBT4): explosion-proof ballasts and junction boxes
- High-hardness water: anti-scaling coating and enhanced cleaning
- High-iron water: iron-removal pretreatment and automatic cleaning
- Low-temperature environments: thermal insulation with heat tracing and low-temperature lamps
- Outdoor installation: weather and sun canopy with insulation
3.9 Combined process schemes
- UV + chlorine (residual disinfection)
- UV + ozone (advanced oxidation)
- UV + activated carbon (organic removal)
- Pretreatment + UV (filtration + disinfection)
- Multiple channels with independently controlled banks
- Combinations customized to water quality and requirements
4. Longkang’s Project Delivery Capabilities
4.1 System integration
- Integrated solution of sterilizer, flow meter, online UVT analyzer, and control system
- Complete disinfection systems supplied (not single units alone)
- System commissioning and validation
- Turnkey project delivery
4.2 Retrofit and upgrade
- Addition to aging systems with bypass construction that avoids service interruption
- Upgrade of existing equipment (module and control system replacement)
- Addition of automatic cleaning and remote monitoring
- Addition of standby equipment
- Water supply maintained throughout the retrofit
4.3 Nationwide service
- Production at two bases in Xianning and Guangzhou
- On-site installation available nationwide
- Nationwide after-sales network
- Logistics and delivery
- Localized service
4.4 Project management
- Dedicated project manager responsibility
- Detailed project schedule (Gantt chart)
- Weekly progress reporting
- Acceptance at quality control hold points
- Risk alerts and response
- On-schedule project delivery
5. Quality Control System
5.1 Incoming material inspection
- Spectrographic analysis of stainless steel grades (304 / 316L)
- Lamp ignition test and UV output measurement
- Quartz sleeve transmittance test (each sleeve)
- Ballast parameter testing
- Visual and hardness checks of seals
- Rejection of non-conforming materials
5.2 In-process inspection
- Dimensional inspection of channels / modules
- Weld quality inspection (visual + dye penetrant testing)
- Polish quality inspection (surface roughness tester)
- Lamp assembly inspection
- Electrical assembly inspection (wiring, insulation)
- Cleaning device assembly inspection
- Records and sign-off at critical process stages
5.3 Factory acceptance inspection
- Visual inspection
- Dimensional inspection
- Hydrostatic pressure test (1.5 times working pressure, held for 30 minutes)
- Electrical testing (insulation resistance, withstand voltage, earth resistance)
- Operating test (2 hours continuous, with temperature and current monitored)
- UV intensity measurement (each lamp)
- Automatic cleaning test
- Control system function test
- Every unit tested, with a factory test report supplied
5.4 Installation inspection
- Installation position check
- Channel levelness check
- Module installation check
- Pipe connection check
- Electrical wiring check
- Earthing check
- Installation acceptance record
5.5 Commissioning and acceptance
- Water flow test (leak check)
- Powered operation
- Parameter measurement (UV intensity, water level, flow)
- Automatic cleaning commissioning
- Remote monitoring integration test
- Water quality testing (third party)
- 72-hour continuous operation test
- Commissioning and acceptance report
6. Documentation Delivered
Each system is supplied with a complete documentation package:
- Product certificate of conformity
- UV disinfection efficacy test report (third party)
- Electrical safety test report
- Hydrostatic pressure test report
- Factory test report
- Operating manual
- Installation drawings (channel layout, equipment foundation)
- Electrical schematics, wiring diagrams, terminal diagrams
- Maintenance manual
- Spare parts list
- Warranty card
- Packing list
- Acceptance report
- Operator training record
7. Representative Custom Projects
7.1 Case 1: Chemical park wastewater (high salinity + explosion-proof)
- Challenge: high salinity (chloride (Cl-) above 5,000 mg/L) and explosion-proof requirements across the site
- Custom solution: 316L stainless steel channel and modules, explosion-proof ballast cabinet (ExdIIBT4), and special seals
- Equipment: LK-OC-UV-500 (custom explosion-proof version)
- Result: stable operation, corrosion resistance, and passage of explosion-proof acceptance
7.2 Case 2: Wastewater plant retrofit (matching an existing channel)
- Challenge: non-standard existing channel dimensions (1.2 m wide, 0.9 m deep) incompatible with standard modules
- Custom solution: modules sized to the existing channel, with replacement lamps and control system
- Equipment: custom M12 module (width matched to the 1.2 m channel)
- Result: existing channel reused, civil works reduced, replacement completed in 3 days
7.3 Case 3: Water reclamation plant (automatic dimming + intelligent control)
- Challenge: widely varying flow (500–2,000 m³/h) with a requirement for energy-efficient operation
- Custom solution: medium-pressure lamps with automatic dimming (real-time power adjustment to flow and UVT), intelligent PLC, and data analytics
- Equipment: LK-OC-UV-2000 (medium-pressure, intelligent dimming version)
- Result: 40% energy savings, lower operating cost, and consistent compliant effluent
8. Why Choose Longkang’s Custom Services
- Direct manufacturer: in-house production with controlled quality and competitive pricing
- Technical expertise: experienced engineering team and sound proposals
- Flexible customization: capacity, lamps, channels, controls, and special operating conditions all customizable
- Reliable quality: a complete quality control system with every unit tested
- Complete documentation: full technical documentation and test reports
- Comprehensive service: end-to-end support from consultation through after-sales service
- Proven experience: experience across hundreds of projects and a wide range of complex conditions
- Dual-base supply: Xianning and Guangzhou production bases for timely delivery
- Lifetime support: ongoing after-sales support and upgradeable equipment
- Long-term client relationships: repeat cooperation and referrals
Contact Longkang to schedule an on-site survey with a technical engineer.