Custom Selection Services for Open-Channel UV Disinfection Systems

Open-channel UV disinfection modules installed in a stainless steel channel at a wastewater treatment plant
Custom open-channel UV system sized to project flow, UVT, and channel dimensions

Every wastewater treatment project differs in flow rate, water quality, site conditions, and effluent requirements, so standardized equipment often cannot fully meet project needs. As a specialist manufacturer of open-channel UV disinfection systems, Longkang provides end-to-end customization covering consultation, design, production, installation, and commissioning, so that each project receives a disinfection solution matched to its conditions. This article describes Longkang’s custom selection and engineering capabilities for open-channel UV disinfection systems.

1. Why Custom Selection Is Required

1.1 Project conditions vary widely

  • Flow rates from 100 m³/h to over 10,000 m³/h
  • UV transmittance (UVT) from 40% to 85%
  • Suspended solids (SS) from 5 mg/L to 50 mg/L
  • Effluent standards ranging from Class 1B to special discharge limits
  • Site conditions vary (channel dimensions, available space, power supply)
  • Standardized equipment cannot cover every scenario

1.2 Value of custom selection

  • Assured disinfection performance: design based on actual project water quality and flow, with an accurately sized dose
  • Controlled capital cost: neither over-designed nor under-designed, keeping investment proportionate
  • Lower operating cost: optimized lamp count and power for energy-efficient operation
  • Improved reliability: targeted redundancy so a single fault does not interrupt water flow
  • Site compatibility: customized channel dimensions and mounting arrangements make full use of available space
  • Special requirements: explosion-proof, corrosion-resistant, high-temperature, and high-salinity operating conditions

2. Longkang’s Custom Selection Service Process

2.1 Initial consultation (1–2 days)

  • A technical engineer is assigned to review the basic project information
  • Data collection: flow rate, water quality test reports, effluent standard, site drawings, system diagrams
  • Technical questions answered
  • Response within 24 hours and a preliminary proposal within 3 working days

2.2 On-site survey (large projects, 1–2 days)

  • Complimentary on-site survey (capacity ≥1,000 m³/h or complex projects)
  • Measurement of channel dimensions, available space, and power supply conditions
  • Review of existing system operating conditions
  • Water sampling (where UVT testing is required)
  • Coordination of requirements with the owner and the design institute
  • Issue of a survey report

2.3 Proposal design (3–7 days)

  • UV dose calculation (based on UVT and effluent requirements)
  • Lamp type selection (low-pressure high-output / medium-pressure)
  • Module configuration design (quantity and arrangement)
  • Channel dimension design (width, depth, length)
  • Control system design (local / remote / automatic dimming)
  • Cleaning system design
  • Water level control design
  • Issue of a detailed technical proposal, including:
    • Proposal description
    • Dose calculation report
    • Equipment configuration list
    • Channel layout drawing
    • Electrical schematic
    • Installation dimension drawing
    • Operating cost analysis
    • Investment estimate

2.4 Proposal review and adjustment (1–3 days)

  • Presentation of the proposal to the owner and design institute
  • Proposal revised in response to feedback
  • Technical and economic comparison of multiple options (e.g., low-pressure vs. medium-pressure)
  • Final proposal confirmed
  • Technical agreement signed

2.5 Manufacturing (20–40 days)

  • Production against approved drawings
  • Quality control at critical process stages
  • Customers may witness production at the factory
  • Production progress tracking (weekly reports)
  • Factory acceptance testing of the complete unit, with a test report
  • Packaging and shipping

2.6 Installation and handover (7–20 days)

  • Installation guidance (remote or on-site), or installation by a professional team
  • Equipment positioning, pipe connections, electrical wiring
  • Commissioning (water flow, power, parameter setting)
  • Automatic cleaning commissioning
  • Water level control commissioning
  • Remote monitoring integration
  • Water quality testing (with a third party)
  • Complete acceptance documentation

2.7 After-sales service (long term)

  • Warranty of 1 year (complete unit); lamps warranted for 8,000 hours or 1 year
  • 24-hour technical support
  • On-site repair service
  • Scheduled follow-up visits and maintenance (quarterly / semi-annually)
  • Genuine spare parts supply
  • Lifetime technical support
  • Equipment upgrade and retrofit service

3. Scope of Longkang’s Customization Capabilities

3.1 Treatment capacity

  • Standard capacity: 50–10,000 m³/h
  • Custom capacity: above 10,000 m³/h (multiple channels in parallel)
  • Precise design to the project flow rate
  • Phased construction supported (expansion interfaces reserved)

3.2 Lamp types

  • Low-pressure high-output lamps: 150–320 W
  • Medium-pressure lamps: 1–10 kW
  • Imported lamps: Philips, Heraeus, Trojan
  • Domestic lamps: Cnlight, Youhui
  • Hybrid configuration: medium-pressure combined with low-pressure high-output
  • Selection based on water quality and budget

3.3 Channels

  • Concrete channels: channel design drawings supplied, with civil works by the owner
  • Prefabricated stainless steel channels: factory-built for rapid on-site installation
  • Channel dimensions: customized to treatment capacity and module count
  • Channel material: 304 / 316L stainless steel
  • Channel configuration: single channel / multiple channels in parallel
  • Adaptable to existing channels (retrofit of older plants)

3.4 Modules

  • Lamps per module: 4 / 8 / 12 / 16 (low-pressure) or 2 / 4 (medium-pressure)
  • Module dimensions: customized to channel width
  • Module frame: 316L stainless steel
  • Cleaning device: independent automatic cleaning for each module
  • Special-size modules available (to suit existing channels)

3.5 Control methods

  • Manual control (standard)
  • PLC automatic control with touch screen
  • Automatic dimming (power adjusted to flow / UVT)
  • Remote monitoring (RS485 / 4G / fiber optic)
  • Integration with SCADA / DCS systems (Modbus / Profibus / OPC)
  • Mobile app monitoring
  • Data logging and historical analysis
  • Fault diagnosis and alarms
  • Control logic customized to owner requirements

3.6 Cleaning systems

  • Electric automatic cleaning (standard)
  • Pneumatic automatic cleaning
  • Adjustable cleaning frequency (1–4 times per day)
  • Online chemical cleaning (for heavily scaling water)
  • Cleaning performance monitoring
  • Cleaning scheme customized to water quality

3.7 Water level control

  • Overflow weir control (simple and reliable)
  • Water level sensor with module lifting (precise control)
  • Water level sensor with control valve
  • Water level balancing across multiple channels
  • Water level fluctuation within ±5 mm

3.8 Special operating conditions

  • High-temperature water (up to 80°C): heat-resistant seals and cables
  • High-salinity / seawater: 316L stainless steel with special coating
  • Explosion-proof environments (ExdIIBT4): explosion-proof ballasts and junction boxes
  • High-hardness water: anti-scaling coating and enhanced cleaning
  • High-iron water: iron-removal pretreatment and automatic cleaning
  • Low-temperature environments: thermal insulation with heat tracing and low-temperature lamps
  • Outdoor installation: weather and sun canopy with insulation

3.9 Combined process schemes

  • UV + chlorine (residual disinfection)
  • UV + ozone (advanced oxidation)
  • UV + activated carbon (organic removal)
  • Pretreatment + UV (filtration + disinfection)
  • Multiple channels with independently controlled banks
  • Combinations customized to water quality and requirements

4. Longkang’s Project Delivery Capabilities

4.1 System integration

  • Integrated solution of sterilizer, flow meter, online UVT analyzer, and control system
  • Complete disinfection systems supplied (not single units alone)
  • System commissioning and validation
  • Turnkey project delivery

4.2 Retrofit and upgrade

  • Addition to aging systems with bypass construction that avoids service interruption
  • Upgrade of existing equipment (module and control system replacement)
  • Addition of automatic cleaning and remote monitoring
  • Addition of standby equipment
  • Water supply maintained throughout the retrofit

4.3 Nationwide service

  • Production at two bases in Xianning and Guangzhou
  • On-site installation available nationwide
  • Nationwide after-sales network
  • Logistics and delivery
  • Localized service

4.4 Project management

  • Dedicated project manager responsibility
  • Detailed project schedule (Gantt chart)
  • Weekly progress reporting
  • Acceptance at quality control hold points
  • Risk alerts and response
  • On-schedule project delivery

5. Quality Control System

5.1 Incoming material inspection

  • Spectrographic analysis of stainless steel grades (304 / 316L)
  • Lamp ignition test and UV output measurement
  • Quartz sleeve transmittance test (each sleeve)
  • Ballast parameter testing
  • Visual and hardness checks of seals
  • Rejection of non-conforming materials

5.2 In-process inspection

  • Dimensional inspection of channels / modules
  • Weld quality inspection (visual + dye penetrant testing)
  • Polish quality inspection (surface roughness tester)
  • Lamp assembly inspection
  • Electrical assembly inspection (wiring, insulation)
  • Cleaning device assembly inspection
  • Records and sign-off at critical process stages

5.3 Factory acceptance inspection

  • Visual inspection
  • Dimensional inspection
  • Hydrostatic pressure test (1.5 times working pressure, held for 30 minutes)
  • Electrical testing (insulation resistance, withstand voltage, earth resistance)
  • Operating test (2 hours continuous, with temperature and current monitored)
  • UV intensity measurement (each lamp)
  • Automatic cleaning test
  • Control system function test
  • Every unit tested, with a factory test report supplied

5.4 Installation inspection

  • Installation position check
  • Channel levelness check
  • Module installation check
  • Pipe connection check
  • Electrical wiring check
  • Earthing check
  • Installation acceptance record

5.5 Commissioning and acceptance

  • Water flow test (leak check)
  • Powered operation
  • Parameter measurement (UV intensity, water level, flow)
  • Automatic cleaning commissioning
  • Remote monitoring integration test
  • Water quality testing (third party)
  • 72-hour continuous operation test
  • Commissioning and acceptance report

6. Documentation Delivered

Each system is supplied with a complete documentation package:

  1. Product certificate of conformity
  2. UV disinfection efficacy test report (third party)
  3. Electrical safety test report
  4. Hydrostatic pressure test report
  5. Factory test report
  6. Operating manual
  7. Installation drawings (channel layout, equipment foundation)
  8. Electrical schematics, wiring diagrams, terminal diagrams
  9. Maintenance manual
  10. Spare parts list
  11. Warranty card
  12. Packing list
  13. Acceptance report
  14. Operator training record

7. Representative Custom Projects

7.1 Case 1: Chemical park wastewater (high salinity + explosion-proof)

  • Challenge: high salinity (chloride (Cl-) above 5,000 mg/L) and explosion-proof requirements across the site
  • Custom solution: 316L stainless steel channel and modules, explosion-proof ballast cabinet (ExdIIBT4), and special seals
  • Equipment: LK-OC-UV-500 (custom explosion-proof version)
  • Result: stable operation, corrosion resistance, and passage of explosion-proof acceptance

7.2 Case 2: Wastewater plant retrofit (matching an existing channel)

  • Challenge: non-standard existing channel dimensions (1.2 m wide, 0.9 m deep) incompatible with standard modules
  • Custom solution: modules sized to the existing channel, with replacement lamps and control system
  • Equipment: custom M12 module (width matched to the 1.2 m channel)
  • Result: existing channel reused, civil works reduced, replacement completed in 3 days

7.3 Case 3: Water reclamation plant (automatic dimming + intelligent control)

  • Challenge: widely varying flow (500–2,000 m³/h) with a requirement for energy-efficient operation
  • Custom solution: medium-pressure lamps with automatic dimming (real-time power adjustment to flow and UVT), intelligent PLC, and data analytics
  • Equipment: LK-OC-UV-2000 (medium-pressure, intelligent dimming version)
  • Result: 40% energy savings, lower operating cost, and consistent compliant effluent

8. Why Choose Longkang’s Custom Services

  1. Direct manufacturer: in-house production with controlled quality and competitive pricing
  2. Technical expertise: experienced engineering team and sound proposals
  3. Flexible customization: capacity, lamps, channels, controls, and special operating conditions all customizable
  4. Reliable quality: a complete quality control system with every unit tested
  5. Complete documentation: full technical documentation and test reports
  6. Comprehensive service: end-to-end support from consultation through after-sales service
  7. Proven experience: experience across hundreds of projects and a wide range of complex conditions
  8. Dual-base supply: Xianning and Guangzhou production bases for timely delivery
  9. Lifetime support: ongoing after-sales support and upgradeable equipment
  10. Long-term client relationships: repeat cooperation and referrals

Contact Longkang to schedule an on-site survey with a technical engineer.

UV disinfection, storage tank treatment, on-site hypochlorite (OSHG), chlorine dioxide and ozone systems for municipal, high-rise booster and industrial water.

Contact

Hotline +86 4008-780-280

Mobile / WhatsApp +86 130 1601 3265

R&D center, Guangzhou +86 20 28185170

Plant in Xianning, Hubei · R&D in Guangzhou, Guangdong