Full Production Process of UV Sterilizers

Longkang UV sterilizers are manufactured under a standardized production process, with strict control at every stage from raw materials to finished product. Understanding the production process helps customers evaluate product quality and manufacturing. This article describes the complete UV sterilizer production process.
1. Production process overview
The Longkang UV sterilizer production process is as follows:
- 1. Raw material inspection → 2. Stainless steel chamber fabrication → 3. Chamber polishing → 4. Welding → 5. Hydrostatic test → 6. Lamp and quartz sleeve assembly → 7. Electrical assembly → 8. Full-unit commissioning → 9. Factory inspection → 10. Packaging and warehousing
2. Raw material inspection
2.1 Stainless steel sheet
- Material: 304 or 316L stainless steel
- Standard: GB/T 20878 designations for stainless steel
- Inspection items: material spectrum analysis, thickness measurement and surface quality
- Non-conforming material is rejected
- A material certificate is supplied with each batch
2.2 UV lamps
- Low-pressure or medium-pressure UV lamps
- Inspection items: power, UV output, starting performance and appearance
- Lighting test to confirm normal operation
- Branded lamps are supplied with a certificate of conformity
2.3 Quartz sleeves
- High-purity quartz glass
- Inspection items: transmittance, dimensions, appearance and wall thickness
- Transmittance ≥90% at 254 nm
- No bubbles and no stones
2.4 Electronic ballasts
- Inspection items: input and output parameters, protection functions and appearance
- Power-on test
- Power factor ≥0.95
2.5 Seals
- Fluororubber O-rings
- Inspection items: dimensions, hardness and appearance
- Ageing-resistant and corrosion-resistant
3. Stainless steel chamber fabrication
3.1 Cutting
- Stainless steel sheet is cut to the dimensions on the drawing
- CNC shearing machine or laser cutting
- Dimensional accuracy ±0.5 mm
- Burr removal
3.2 Rolling
- A plate rolling machine forms the flat sheet into a cylinder
- Diameter tolerance ±1 mm
- Ovality ≤2 mm
- Both ends are aligned
3.3 Welding
- Longitudinal seam welding: argon arc welding (TIG)
- Welding material: wire of the same material grade
- Smooth weld seam, with no pores or cracks
- Slag is cleaned off after welding
3.4 Flange welding
- Inlet and outlet flanges are welded to the chamber
- Flange standard: GB/T 9119
- Continuous weld with no leakage
- Flange flatness is corrected after welding
3.5 Lamp-holder hole machining
- Lamp-holder holes are machined at the end or side of the chamber
- CNC lathe or milling machine
- Hole position accuracy ±0.5 mm
- Hole edges are chamfered
4. Chamber polishing
4.1 Inner wall polishing
- Mechanical polishing or electrolytic polishing
- Inner wall roughness Ra ≤0.8 µm
- Bright, scratch-free surface
- Reduced microbial adhesion
4.2 Outer surface treatment
- Brushed or matte finish
- Uniform surface
- Optional powder coating for outdoor models
5. Hydrostatic test
5.1 Test pressure
- 1.5 times the rated working pressure
- Standard model: 1.5 MPa (rated 1.0 MPa)
- Pressure holding time: 10 to 30 minutes
5.2 Test method
- The chamber is filled with water and air is purged
- Pressure is raised to the test pressure
- Pressure is held and inspected
- No leakage and no deformation constitute a pass
5.3 Records
- The test record of every unit is filed
- Test pressure, holding time and result are recorded
- The test operator signs the record
6. Lamp and quartz sleeve assembly
6.1 Quartz sleeve installation
- The sleeve passes through the lamp-holder hole
- Sealing seats and O-rings are fitted at both ends
- The compression nut is tightened
- The seal is checked for water tightness
- The sleeve is centred and does not touch the lamp
6.2 Lamp installation
- The lamp is inserted into the quartz sleeve from one end
- The lamp cap is inserted into the lamp holder
- The lamp cap is locked in place
- The lamp is centred and does not touch the sleeve wall
- With multiple lamps, each lamp is installed independently
6.3 Seal check
- Water is passed through the unit under test pressure
- The lamp-holder seals are checked
- No leakage constitutes a pass
- External moisture is wiped dry
7. Electrical assembly
7.1 Ballast installation
- The ballast is fixed inside the control box
- Good heat dissipation
- Secure wiring
- Each lamp is fitted with an individual ballast
7.2 Wiring
- Input: connected to the power terminals
- Output: connected to the lamps
- Ground: connected to the ground terminal
- Wire numbers are marked for easy maintenance
- Wiring follows the electrical schematic
7.3 Control components
- Operation indicator light
- Fault indicator light
- Lamp elapsed-time counter
- UV intensity monitor (optional)
- Alarm buzzer (optional)
7.4 Control box sealing
- The control box is isolated from the chamber
- Waterproof cable glands at cable entries
- Sealed box door
- IP65 protection rating
8. Full-unit commissioning
8.1 Pre-power checks
- Correct wiring
- Reliable grounding
- No short circuit
- Fuse intact
8.2 Power-on test
- Power is switched on
- Lamps light up in sequence
- The operation indicator illuminates
- No abnormal noise or odour
8.3 Parameter test
- Input voltage and current
- Lamp power
- UV intensity
- Power factor
8.4 Protection function test
- Overcurrent protection
- Short-circuit protection
- Grounding test
9. Factory inspection
9.1 Visual inspection
- Smooth surface with no scratches
- Clear markings
- Smooth weld seams
- Complete accessories
9.2 Dimensional inspection
- Overall dimensions
- Connection dimensions
- Installation dimensions
- Conformity with the drawing
9.3 Performance inspection
- Hydrostatic test (already completed during production)
- Electrical insulation test
- Operation test
- UV intensity measurement
9.4 Documentation
- Certificate of conformity
- User manual
- Electrical schematic
- Warranty card
- Test report
10. Packaging and warehousing
10.1 Packaging
- Lamps are packaged individually with shock protection
- The main unit is packed in a wooden case or carton
- Shockproof and moisture-proof
- Accessories are packed with the unit
10.2 Marking
- Product nameplate
- Package markings: fragile, moisture-sensitive, this side up
- Shipping label
10.3 Warehousing
- Units are stored only after passing inspection
- Categorized storage
- First in, first out
11. Longkang’s process advantages
- Source factory with the entire process manufactured in-house
- CNC machining for accurate dimensions
- Argon arc welding for neat weld seams
- Polished inner wall to a hygienic standard
- Hydrostatic test on every unit to ensure no leakage
- Complete electrical testing for safety and reliability
- Strict factory inspection with a 100% pass rate
- Two production bases in Xianning and Guangzhou for fast delivery